Providing project management solutions since 1985
OPTIMIZING ROUTINE & COMPLEX MAINTENANCE IN THE UTILITIES INDUSTRY
Oracle’s Primavera Enterprise Project and Portfolio Management (EPPM) solution can greatly improve scheduling, resource allocation, cost estimates, and cash flow tracking for utilities by providing an enterprise view of all maintenance projects.
Click here to learn more!
NEW TRAINING COURSE!
Click here to learn more about our P6 Release 8 Training Course
WAYS TO EXPAND YOUR KNOWLEDGE... FOR FREE!
View & register for upcoming webinars
Attend an upcoming OPUG meeting
View a complimentary product demo
FRIEND, FAN & FOLLOW
Socialize with Evans on the Web!
JOIN
Click here to learn more about the Oracle|Primavera User Group
SUBSCRIBE
Click here to get our monthly e-newsletter, the Evans Insight.
COURSE 102- Project Management in P6 Client Server
Provides hands-on training for Primavera’s
client/server-based solution, leading participants through the
entire project life cycle, from planning to execution. Topics
include adding activities, assigning resources, and creating a
baseline. Participants also gain a thorough background in the
concepts of planning and scheduling. All workshops and instruction
stress the three basic elements of project management: schedule,
resource and costs.
Course Length: Three Days
Day One:
Introduction to Primavera
Describe Primavera solutions
Describe P6
The Project Management Life Cycle
Review the relationship between Primavera and the Project Management
Life Cycle
Identify the five process groups in the Project Management Life
Cycle
Data, Navigating, and Layouts
Describe enterprise and project-specific data
Log in
Open an existing project
Navigate in the Home window and Activities window
Open an existing layout
Customize a layout
Save a layout
Enterprise Project Structure
Describe the components that comprise the Enterprise Project
Structure
View the EPS
Creating a Project
Create a project
Navigate in the Projects window
View and modify information in Project Details
Creating a Work Breakdown Structure
Define a Work Breakdown Structure
Create multiple levels of a WBS hierarchy
Adding Activities
Describe an activity and its components
Describe activity types
Add activities
Add a Notebook topic to an activity
Add steps to an activity
Assign activity codes to activities
Day Two:
Creating Relationships
View a network logic diagram
Differentiate between the four relationship types
Create relationships in the Activity Network
Create relationships in Activity Details
Scheduling
Perform a forward and backward pass
Describe float and its impact on a schedule
Identify loops and open ends
Calculate a schedule
Analyze the scheduling log report
Assigning Constraints
Apply an overall deadline to a project
Apply a constraint to an individual activity
Add notebook topics to constrained activities
Describe the available constraint types
Maintaining the Project Documents Library
Describe the difference between a work product and a reference
document
Create a document record
Link the document record to a project document or work product
Assign the project document to an activity or WBS
Formatting Schedule Data
Group activities according to a specific criteria
Sort activities
Apply a filter
Create a filter
Roles and Resources
Describe roles
Views the roles dictionary
Describe resources
Identify the differences between labor, nonlabor and material
resources
View the resource dictionary
Assigning Roles
Assign roles to an activity
Assign rates on roles
Day Three:
Assigning Resources and Costs
Assign resources by role
Assign labor, nonlabor, and material resources to activities
Adjust Budgeted Units/Time for a resource
Assign expenses to activities
Analyzing Resources
Display the Resource Usage Profile
Format a profile
Format the timescale
Optimizing the Project Plan
Analyze schedule dates
Shorten a project schedule
Analyze resource availability
Remove resource overallocation
Analyze project costs
Baselining the Project Plan
Create a baseline plan
Display baseline bars on the Gantt Chart
Modify the bars on the Gantt Chart
Project Execution and Control
Describe several methods for updating the project schedule
Use Progress Spotlight
Status activities
Reschedule the project
Reporting Performance
Describe reporting methods
Run a schedule report
Create a resource report with the Report wizard
Create a report using the current layout
Project Web Site
Create and launch a project Web site
Customize the appearance of a project Web site
Publish activity layouts as HTML pages
All rights Reserved.
