Managing Projects in Primavera P6 Professional Release 8.0 (Client)
This course leads participants through the entire project life cycle, from planning to execution. Topics include adding activities, assigning resources, and creating a baseline. Participants also gain a thorough background in the concepts of planning and scheduling and are introduced to advanced project analysis methods such as earned value.
All workshops and instruction stress the three basic elements of project management: schedule, resource and costs. At the end of each day, students apply the concepts and functionality they learned in a case study. The course is divided into five sections: Overview and Creating a Project; Scheduling the Project and Managing Data; Assigning Resources and Baselining; Project Execution and Control; and Advanced Topics.
| Schedule | Duration | PDUs | CEUs |
|---|---|---|---|
5 Days |
32.5 |
3.25 |
Get more bang for your buck! Managing Projects in Primavera P6 Professional Release 8 (Client) is also the equivalent of the Advanced P6 course and the introductory P6 client course combined, plus it is relevant to both P6 Version 7 and P6 Release 8 users. |
|---|
Audience:
Functional ImplementerBusiness Analysts
End Users
Project Manager
Suggested Prerequisites:
Knowledge of project management principles
Course Objectives:
Manage multiple projects
Create a project
Create a Work Breakdown Structure
Add activities
View calendars
Create relationships
Schedule the project
Assign constraints
Format schedule data
Define roles and resources
Assign roles
Assign resources and costs
Analyze resources
Optimize the project plan
Execute the project
Use earned value analysis
Course Topics:
Understanding P6 Data
Describing Enterprise and Project-Specific data
Logging In
Opening an Existing Project
Opening and Customizing Layouts
Enterprise Project Structure
Describing Components of EPS
Creating a Project
Create a project
Navigating in the Projects Window
Viewing Project Details
Creating a Work Breakdown Structure
Defining a Work Breakdown Structure
Creating the WBS Hierarchy
Adding Activities
Describing an Activity and its Components
Describing Activity Types
Adding Activities
Adding a Notebook Topic
Adding Steps to an Activity
Assigning Activity Codes
Creating Relationships
Viewing a Network Logic Diagram
Relationship Types
Creating Relationships
Scheduling
Performing a Forward and Backward Pass
Describing Float
Assigning Constraints
Applying an Overall Deadline to a Project
Apply a Constraint to an Activity
Maintaining the Project Documents Library
Creating a Document Record
Linking a Document Record
Formatting Schedule Data
Grouping Activities
Sorting
Filtering
Roles and Resources
Describing Roles and Resources
Viewing Dictionaries
Assigning Roles
Assigning Roles to an Activity
Assign Rates on Roles
Assigning Resources
Assigning Resources
Adjusting Budgeted Units/Time
Analyzing Resources
Displaying the Resource Usage Profile
Optimizing the Project Plan
Analyzing Schedule Dates
Shortening a Project Schedule
Analyzing Resource Availability
Baselining the Project Plan
Creating a Baseline Plan
Display Baseline Bars on the Gantt Chart
Project Execution and Control
Describing Methods for Updating the Schedule
Using Progress Spotlight
Statusing Activities
Rescheduling the Project
Reporting Performance
Describing Reporting Methods
Running a Schedule Report
Creating a report with the Report Wizard
Advanced Project Analysis
Using Duration Types
Using Percent Complete Types
Using Earned Value Analysis
Advanced Scheduling
Managing Multiple Float Paths
Scheduling Logic Options
For more information, please contact our training department:
Training@EvansTech.com | 770.751.9950